








A man and a woman wearing a vibe coat on two sides of an empty hat.
Section No. IH G686
Code number: one, two, three.
Colour: Grey
Project G/R, the new tough guy.
I’d call it an art piece.
100 holes in the whole suit, double-sided inside.
I can wear both sides.
It’s a lot of detail.
It took three months from copying to delivery.
It takes a lot of time and it costs a lot.
Long lead times.
Customize the same appliance, OS-style.